checkAd

     149  0 Kommentare Imperial Reports Production Update for 2024 First Quarter

    VANCOUVER, British Columbia, April 25, 2024 (GLOBE NEWSWIRE) -- Imperial Metals Corporation (“Imperial”) (TSX:III) reports quarterly copper and gold production from Mount Polley and Red Chris mines. Imperial’s production was 12.353 million pounds copper and 12,861 ounces gold, with 7.355 million pounds copper and 10,009 ounces gold coming from Mount Polley and 4.998 million pounds copper and 2,852 ounces gold from its 30% share of Red Chris mine production.

    Mount Polley metal production (100%) for the first quarter of 2024 was 7.355 million pounds copper and 10,009 ounces gold, compared to 6.678 million pounds copper and 9,980 ounces gold produced during the first quarter of 2023.

         
    Mount Polley Mine Production   Three Months Ended March 31
        2024   2023
    Ore milled - tonnes   1,671,505   1,389,636
    Ore milled per calendar day - tonnes   18,368   15,440
    Grade %  - copper   0.251   0.269
    Grade g/t  - gold   0.282   0.313
    Recovery %  - copper   79.4   81.1
    Recovery %  - gold   66.0   71.5
    Copper – million pounds   7.355   6.678
    Gold – ounces   10,009   9,980
             

    Lesen Sie auch

    Mill throughput was up 20.3%, with 1.671 million tonnes being treated compared with 1.390 million tonnes treated in the first quarter of 2023. Copper production in the first quarter 2024 was up by 10.1% as a result of the increase in throughput which offset lower grade and recovery compared to first quarter 2023.

    Seite 1 von 3



    globenewswire
    0 Follower
    Autor folgen

    Verfasst von globenewswire
    Imperial Reports Production Update for 2024 First Quarter VANCOUVER, British Columbia, April 25, 2024 (GLOBE NEWSWIRE) - Imperial Metals Corporation (“Imperial”) (TSX:III) reports quarterly copper and gold production from Mount Polley and Red Chris mines. Imperial’s production was 12.353 million pounds …