https://mailchi.mp/aacde37265a2/probe-gold-intersects-64-gt-au-cut-over-183-metres-at-the-monique-deposit-novador-project-quebec?e=0613133e6b
Probe Gold intersects 6.4 g/t Au (cut) over 18.3metres
at the Monique deposit, Novador Project, Quebec
Highlights:
Multiple high-grade gold intercepts found within and around the Monique conceptual pit.
Infill drilling continues to intersect thick gold zones inside the conceptual pit, yielding up to 6.4 g/t Au over 18.3 metres (11.8 g/t Au over 18.3 metres uncut, including 223 g/t Au over 0.8 metre); 3.3 g/t Au over 27.9 metres; and 1.9 g/t Au over 47.9 metres.
Exploration and expansion drilling around and inside the Monique conceptual pit intersected new significant mineralization grading up to 16.6 g/t Au over 2.0 metres; 1.6 g/t Au over 19.5 metres; and 2.7 g/t Au over 11.8 metres.
Over 70,000 metres of drilling have been completed at Novador in 2023. Drilling for this year is finished at Monique, and two drills are now active at Courvan.
Planning a 30,000 metres expansion drill program for Q1 2024 at Novador.
...