Falcon Oil - etwas Großes bahnt sich an (Seite 5)
eröffnet am 06.02.06 13:07:11 von
neuester Beitrag 09.06.24 12:45:37 von
neuester Beitrag 09.06.24 12:45:37 von
Beiträge: 25.500
ID: 1.038.176
ID: 1.038.176
Aufrufe heute: 10
Gesamt: 1.548.041
Gesamt: 1.548.041
Aktive User: 0
ISIN: CA3060711015 · WKN: A0EALA · Symbol: FAC
0,0630
GBP
+2,44 %
+0,0015 GBP
Letzter Kurs 07.06.24 London
Neuigkeiten
TitelBeiträge |
---|
23.05.24 · globenewswire |
16.05.24 · globenewswire |
07.05.24 · globenewswire |
26.04.24 · globenewswire |
Werte aus der Branche Öl/Gas
Wertpapier | Kurs | Perf. % |
---|---|---|
1,0000 | +69,49 | |
1,6800 | +19,36 | |
1,3500 | +13,45 | |
4,5100 | +11,36 | |
17,800 | +9,94 |
Wertpapier | Kurs | Perf. % |
---|---|---|
19,500 | -8,02 | |
21,910 | -8,71 | |
0,8100 | -10,00 | |
0,5960 | -15,10 | |
7,1000 | -32,38 |
Beitrag zu dieser Diskussion schreiben
Die Testrate sieht gut aus. In Kombination mit den höheren Gaspreisen und dem US know how (Sheffield-Pioneer, und den US Servicefirmen die sich am Operator TBN beteiligt haben), müsste eigentlich das Beetaloo eine Wirtschaftlichkeit erreichen könnte, die (man darf ein wenig träumen) besser sein könnte als in den USA.
SS-1H achieves commercial IP30 flow rate of 3.2 MMcf/d (normalized to
6.4 MMcf/d over 1,000 metres), exceeding pre-drill expectation
Damit wird der offizielle Startschuss gegeben um von der Exploration in das Development zu gehen. TBN hat auch die zertifizierten Zahlen zu den ressourcen erhöht.
Leider "nur" die Links zum Operator TBN, weil die Schnarchnase in Irland noch schläft.
https://www.investi.com.au/api/announcements/tbn/8cb35ed7-0c…
https://www.investi.com.au/api/announcements/tbn/841ac958-0d…
SS-1H achieves commercial IP30 flow rate of 3.2 MMcf/d (normalized to
6.4 MMcf/d over 1,000 metres), exceeding pre-drill expectation
Damit wird der offizielle Startschuss gegeben um von der Exploration in das Development zu gehen. TBN hat auch die zertifizierten Zahlen zu den ressourcen erhöht.
Leider "nur" die Links zum Operator TBN, weil die Schnarchnase in Irland noch schläft.
https://www.investi.com.au/api/announcements/tbn/8cb35ed7-0c…
https://www.investi.com.au/api/announcements/tbn/841ac958-0d…
Das heutige Satellitenfoto macht Hoffnung und Freude:
https://apps.sentinel-hub.com/eo-browser/?zoom=17&lat=-16.84…
https://apps.sentinel-hub.com/eo-browser/?zoom=17&lat=-16.84…
12. feb, 2024, die fackel für den produktionstest brennt nach wie vor
https://apps.sentinel-hub.com/eo-browser/?zoom=15&lat=-16.84…
https://apps.sentinel-hub.com/eo-browser/?zoom=15&lat=-16.84…
Und hier noch ein nettes aktuelles Fackelfoto (InfraRot):
Https://apps.sentinel-hub.com/eo-browser/?zoom=17&lat=-16.84…
Https://apps.sentinel-hub.com/eo-browser/?zoom=17&lat=-16.84…
das ganz Falcon dauert schon länger als ewig
Antwort auf Beitrag Nr.: 75.179.963 von texas2 am 29.01.24 09:06:33Das dauert ja ewig
Fragt sich auch was da kursmässig überhaupt drin liegt, ein KZ von Research Tree lauter 37p, ist wohl krasses Wunschdenken…
Fragt sich auch was da kursmässig überhaupt drin liegt, ein KZ von Research Tree lauter 37p, ist wohl krasses Wunschdenken…
Antwort auf Beitrag Nr.: 75.178.856 von texas2 am 28.01.24 21:16:23... und jetzt endlich die offizielle Mitteilung zu diesem test:
29 January 2024 – Falcon Oil & Gas Ltd. (TSXV: FO, AIM: FOG) is pleased to announce the commencement of the 30-day initial production (IP30) testing at the Shenandoah South 1H (“SS1H”) well in EP117, operated by Falcon Oil & Gas Australia Limited’s joint venture partner, Tamboran B2 Pty Limited.
Following the completion of the 10-stage stimulation program announced on 7 December 2023 and the subsequent successful installation of production tubing, the SS1H well was opened to allow sufficient flow back of stimulation fluid ahead of commencing the IP30 test. For normal operational reasons, the SS1H well was shut-in for a three week soak period and was successfully re-opened on 25 January 2024. The aim of soaking was to allow for sufficient stimulation fluid to be absorbed by the shale, increasing the relative permeability to gas of the formation and enhancing future production performance. The IP30 test has now commenced, and results are expected by the end of February 2024.
Proof of commercial flow rates as measured over the IP30 day period and which Falcon estimates to be 1.5 million cubic feet per day (“MMcf/d”) over the 500 metre horizontal section (3.0 MMcf/d normalised over 1,000 metres) or greater will allow the joint venture to progress the sanctioning of the proposed 40 MMcf/d pilot project at Shenandoah South during the first half of 2024.
Philip O’Quigley, CEO of Falcon commented:
“We look forward to this next phase of operations with the initial production testing of the SS1H well in the Beetaloo and will continue to update the market as results become available.”
29 January 2024 – Falcon Oil & Gas Ltd. (TSXV: FO, AIM: FOG) is pleased to announce the commencement of the 30-day initial production (IP30) testing at the Shenandoah South 1H (“SS1H”) well in EP117, operated by Falcon Oil & Gas Australia Limited’s joint venture partner, Tamboran B2 Pty Limited.
Following the completion of the 10-stage stimulation program announced on 7 December 2023 and the subsequent successful installation of production tubing, the SS1H well was opened to allow sufficient flow back of stimulation fluid ahead of commencing the IP30 test. For normal operational reasons, the SS1H well was shut-in for a three week soak period and was successfully re-opened on 25 January 2024. The aim of soaking was to allow for sufficient stimulation fluid to be absorbed by the shale, increasing the relative permeability to gas of the formation and enhancing future production performance. The IP30 test has now commenced, and results are expected by the end of February 2024.
Proof of commercial flow rates as measured over the IP30 day period and which Falcon estimates to be 1.5 million cubic feet per day (“MMcf/d”) over the 500 metre horizontal section (3.0 MMcf/d normalised over 1,000 metres) or greater will allow the joint venture to progress the sanctioning of the proposed 40 MMcf/d pilot project at Shenandoah South during the first half of 2024.
Philip O’Quigley, CEO of Falcon commented:
“We look forward to this next phase of operations with the initial production testing of the SS1H well in the Beetaloo and will continue to update the market as results become available.”
am 28.01.2024 hat es wieder eine Fackelsignatur
23.05.24 · globenewswire · Falcon Oil & Gas |
16.05.24 · globenewswire · Falcon Oil & Gas |
07.05.24 · globenewswire · Falcon Oil & Gas |
26.04.24 · globenewswire · Falcon Oil & Gas |
26.04.24 · globenewswire · Falcon Oil & Gas |
23.04.24 · globenewswire · Falcon Oil & Gas |
22.04.24 · globenewswire · Falcon Oil & Gas |
18.04.24 · globenewswire · Falcon Oil & Gas |
12.04.24 · globenewswire · Falcon Oil & Gas |
26.03.24 · globenewswire · Falcon Oil & Gas |